MODEL SERIES COMPARISON *
MODEL SERIES | A | X | C | P, HP |
---|---|---|---|---|
FULLY CONTAINED FLAME & COMBUSTION | √ | √ | √ | √ |
DIGITAL TIMING AUTO SHUT DOWN | √ | √ | √ | √ |
STEEL CHAMBERS 2800F REFRACTORY LINED | √ | √ | √ | √ |
EXTERIOR SHELLS HIGH HEAT PAINTED | √ | √ | √ | √ |
STAINLESS CHAMBERS OPTIONAL | √ | √ | √ | √ |
GRATE BAR SUBFLOOR IN BURN CHAMBER | √ | |||
SECONDARY CHAMBER SC2 | √ | √ | ||
SECONDARY CHAMBER MODELS SC4 & SC8 | √ | √ | ||
SECONDARY CHAMBER MODELS SC30 & LARGER | √ | |||
UL/CSA/FM SAFETY APPROVED BURNER COMPONENTS | √ | √ | √ | √ |
STEEL CASE STACK REFRACTORY LINED | √ | √ | ||
STAINLESS OR PAINTED STEEL STACK UNLINED | √ | √ | ||
STAINLESS STACK CAP | √ | √ | √ | √ |
TEMPERATURE CONTROLLED WITH DISPLAY | √ | √ | ||
24/7 TEMPERATURE DATA RECORDING | √ | √ | ||
AVAILABLE IN 120/60, or 220/50 | √ | √ | √ | √ |
GENERAL WASTES, FOOD, PAPER, BIO MASS | √ | √ | √ | √ |
CONTRABAND , CANNABIS , MEDICAL | √ | √ | √ | √ |
MASS, SEGREGATED, OR PRIVATE ANIMAL CREMATION | √ | √ | √ | √ |
AVAILABLE AS MOBILE UNIT | √ | √ | √ | |
STACK EMISSION DATA AVAILABLE | √ | √ | √ | √ |
DESIGNED FOR CUSTOMER ASSEMBLY | √ | √ | √ | √ |
OPERATING DETAILS
CONSULT THE FACTORY FOR SPECIFIC NEEDS AND EXCEPTIONS
Example: Highlighted values are if a C12 SC4 in 120 volts with LP gas were selected
MODEL SERIES | A | X | C | P, HP | ||
---|---|---|---|---|---|---|
PRIMARY CHAMBER CUBIC FEET (FT3) | A200 = 6 FT3 A400 = 12 FT3 A600 = 19 FT3 A850 = 27 FT3 | 200X = 6 FT3 400X = 12 FT3 600X = 19 FT3 850X = 27 FT3 | C6 = 6 FT3 C12 = 12 FT3 C19 = 19 FT3 C27 = 27 FT3 | P16 = 16 FT3 P25 = 25 FT3 P50 = 50 FT3 P77 = 77 FT3 | ||
PRIMARY CHAMBER BASED ON 33LBS/CF (LB) | A200 = 200 LB A400 = 400 LB A600 = 600 LB A850 = 850 LB | 200X = 200 LB 400X = 400 LB 600X = 600 LB 850X = 850 LB | C6 = 200 LB C12 = 400 LB C19 = 600 LB C27 = 850 LB | P16=528 LB P25 = 825 LB P50 = 1650 LB P77 = 2541 LB | ||
PRIMARY CHAMBER TOTAL FIRING RATE BTU/HR *Changes available | A200 = 275,000 A400 = 275,000 A600 = 530,000 A850 = 660,000 | 200X = 275,000 400X = 275,000 600X = 530,000 850X = 530,000 | C6 = 275,000 C12 = 275,000 C19 = 530,000 C27 = 660,000 | P16 = 415,000 P25 = 415,000 P50 = 1,010,000 P77 = 1,010,000 | ||
POWER OPTIONS VOLTS/HERTZ/AMPS | 120/60/20 230/50/10 | 120/60/20 230/50/10 | 120/60/20 230/50/10 | 120/60/20 230/50/10 | ||
GAS PRESSURE LP/NG INCHES W.C. | 11/7 | 11/7 | 11/7 | 11/7 | ||
DIESEL NOZZLES | Factory Set | Factory Set | Factory Set | Factory Set | ||
SECONDARY AFTERBURNER CHAMBER OPTIONS | ||||||
BTU Range | Retention | Temperature | Modulating Fuel/Air | |||
MODEL SC2 (2 FT3) | 75,000 | Up to 0.25 sec | 1200 F | No | ||
MODEL SC4 (4 FT3) | 415,000 | Up to 0.5 sec | 1600 F | No | ||
MODEL SC8 (8 FT3) | 660,000 | Up to 0.5 sec | 1600 F | No | ||
MODEL SC30 (30 FT3) | 1,200,000 | Up to 1 sec | 1800 F | Yes | ||
MODEL SC40 & larger (40+ FT3) | 1,200,000- 2,200,000 | Up to 2 sec | 1800 F | Yes |